Description
Product Introduction (Anti-Template)
The H3 variant represents the absolute maximum density in the TRLY series—this is the board you choose when rack space is critically constrained and you need the most latching relays per slot. The IS200TRLYH3E is the revision E variant of the TRLY series with the H3 ultra-high-density channel configuration. This board combines the sealed relay architecture of the ‘E’ revision with the highest relay density available in the TRLY family.
What does the H3 density mean in practice? The H3 variant typically offers significantly more latching relays per board than the H2—sometimes 2x the density of the H1. The ‘E’ revision brings hermetically sealed relays with glass-to-metal seals, protecting contacts from contamination and oxidation, plus enhanced TVS protection for robust transient suppression. The extreme density demands careful thermal management and precise wiring techniques. This board is a drop-in replacement for the IS200TRLYH3D, with no software changes required.
Key Technical Specifications
| Parameter | Value / Detail |
|---|---|
| Manufacturer | General Electric (GE) |
| Part Number | IS200TRLYH3E |
| Series | Mark VIe Speedtronic |
| Function | TRLY Termination Board (Latching Relay Output – Ultra-High Density) |
| Nominal Voltage | 24V DC |
| Output Type | Latching relay (hermetically sealed) |
| Channel Count | Ultra-high-density H3 configuration |
| Relay Package | Sealed (glass-to-metal seal) |
| Coil Transient Protection | Enhanced TVS diodes |
| Environmental Protection | Moisture and chemical resistant |
| Connector Type | 37-pin D-sub and terminal blocks |
| Mounting | DIN-rail or chassis mount |
| Operating Temp | 0 to 60°C (ambient) |
| Relative Humidity | 5% to 95% (non-condensing) |
| Compatible Rack | Mark VIe IS200 series backplane |
Compatible Replacement Models
✅ Drop-in Replacement: IS200TRLYH3D — The immediate predecessor. Identical pinout, mounting, and software interface. The ‘E’ has sealed relays, enhanced TVS protection, and better moisture resistance. No software changes required.
⚠️ Software Compatible: IS200TRLYH2E — Lower-density H2 variant. Fits the same slot but has fewer latching relay outputs. Requires software reconfiguration. Budget 4-6 hours for rework.
⚠️ Software Compatible: IS200TRLYH1E — Lower-density H1 variant. Fits the same slot but has significantly fewer latching relay outputs. Requires software reconfiguration. Budget 4-6 hours for rework.
⚠️ Software Compatible: IS200TREGH3B — Standard non-latching relay board. Does not retain state through power loss. Requires software reconfiguration for latching logic. Budget 4-6 hours.
❌ Hardware Incompatible: IS200TPROH3B — Triac output board. No latching capability. Requires software and hardware rework. Budget 6-8 hours plus validation.
❌ Hardware Incompatible: IS200TBQGH1A — Excitation termination board. Different pinout and application. Not applicable.
Frequently Asked Questions (FAQ)
Q: What makes the H3 variant different from the H1 and H2?
A: The H3 has the highest channel density—significantly more latching relays per board than the H2, and 2x+ the density of the H1. This is for plants with severe space constraints where maximum I/O density is required.
Q: What cooling requirements does the H3 variant have?
A: The H3 generates substantial heat due to the extreme relay density. We recommend at least 250 CFM airflow across the rack and keeping ambient below 45°C. The sealed relays help with thermal management, but the density still demands serious ventilation.
Q: Can I replace a TRLYH3D board with a TRLYH3E without any changes?
A: Yes. The ‘E’ is a drop-in replacement. No software changes, no wiring changes, no configuration changes.
Q: What types of applications require H3 density?
A: Applications with severe space constraints: retrofit projects where cabinet space is limited, or new installations where many latching relay outputs are needed in minimal rack space.
Q: Is the TRLYH3E hot-swappable?
A: We strongly advise against hot-swapping ultra-high-density relay boards. Power down the cabinet segment before swapping.
Q: What bench testing should I do before installing a TRLYH3E?
A: Standard latching relay protocol with aggressive thermal stress testing. First, visual inspection—look for sealed relay packages. Second, verify continuity on all channels. Third, measure coil resistance for both set and reset coils. Fourth, apply power and verify each relay latches and unlatches correctly. Fifth, test latch retention through power cycles. Sixth—critical for H3—run a 72-hour thermal stress test at 50°C ambient with all relays cycling continuously. This catches thermal issues that don’t appear on lower-density boards.
Q: What are the wiring challenges with the H3 variant?
A: The terminal blocks are extremely tightly spaced. We strongly recommend pre-insulated ferrules on all wires. Channel numbering is complex and non-intuitive. Always cross-reference with GE documentation before terminating any wiring.
Q: How do I verify I’m getting a genuine TRLYH3E?
A: Look for the sealed relay packages. Weigh the board; due to the extreme channel density, it should be about 455 grams. Look for the GE holographic security label.
Q: What’s the expected lifespan of the TRLYH3E?
A: With proper cabinet cooling (250+ CFM) and clean power, these boards typically run 20+ years. The extreme density means thermal management is critical—ensure your cabinet airflow is adequate.
Q: Where do I find the official wiring diagram for the TRLYH3E?
A: GE document GEK-130545 covers the TRLY series. The H3 variant is detailed in the ultra-high-density section. Terminal numbering is completely different from H1 and H2. Always cross-reference against your cabinet’s as-built drawings. Verify every channel before terminating—miswiring an H3 board is a significant headache.


LKB LKB2211 SUPERRAC PLC
SCHNEIDER UNC-520-2-N PLC
RELIANCE ELECTRIC WR-D4006-A
Email: sales@plcfcs.com
Phone:+86 15343416922
Wechat:+86 15343416922
PLC : Allen Bradley , Siemens MOORE, GE FANUC , Schneider
DCS : ABB ,Honeywell, Invensys Triconex , Foxboro , Ovation,YOKOGAWA, Woodword, HIMA
TSI : Triconex , HIMA , Bently Nevada , ICS Triplex
Complete service we offer
Payment: T/T
Delivery: 1-2 days
Shipment: DHL UPS FedEx, etc
After-sales service: Yes, 24/7 hours




Email: jiedong@sxrszdh.com
Phone / Wechat:+86 15340683922
Wechat:+86 15343416922