ALSTOM UT150-1

The ALSTOM UT150-1 is a critical teleprotection signaling device, also known as a power line carrier (PLC) coupling unit or line trap, used in high-voltage electrical transmission networks. As a component from Alstom Grid’s (now part of GE Grid Solutions and Hitachi Energy) protection and communication portfolio, this device plays a vital role in enabling secure, high-speed communication for protection schemes like directional comparison blocking or permissive overreach transfer trip (DCB/POTT). The ALSTOM UT150-1 is specifically engineered to inject and extract high-frequency protection and telecontrol signals onto and from high-voltage power lines while blocking the power frequency current, ensuring reliable signal integrity for the rapid isolation of faults.

Manufacturer:

Our extensive catalogue, including , is available now for dispatch to the worldwide.
  • Email: jiedong@sxrszdh.com
  • Phone / Wechat:+86 15340683922

Description

Product Overview and Introduction

The ALSTOM UT150-1 is a critical teleprotection signaling device, also known as a power line carrier (PLC) coupling unit or line trap, used in high-voltage electrical transmission networks. As a component from Alstom Grid’s (now part of GE Grid Solutions and Hitachi Energy) protection and communication portfolio, this device plays a vital role in enabling secure, high-speed communication for protection schemes like directional comparison blocking or permissive overreach transfer trip (DCB/POTT). The ALSTOM UT150-1 is specifically engineered to inject and extract high-frequency protection and telecontrol signals onto and from high-voltage power lines while blocking the power frequency current, ensuring reliable signal integrity for the rapid isolation of faults.

Detailed Product Parameters and Specifications

This coupling device is characterized by its high-voltage and high-frequency performance parameters:

  • Primary Function: Coupling Capacitor Voltage Transformer (CCVT) or Line Trap unit for Power Line Carrier (PLC) and protection signaling. It forms part of a coupling system that includes a wave trap and coupling capacitor.
  • Rated System Voltage: Designed for a specific transmission voltage level, such as 110 kV, 132 kV, 220 kV, or 400 kV, corresponding to the line it protects.
  • Frequency Tuning: Tuned to a specific carrier frequency band (typically in the range of 30 kHz to 500 kHz) to allow the protection/telecontrol signals to pass while presenting a high impedance to the power frequency (50/60 Hz), effectively blocking it from the communication equipment.
  • Impedance & Bandwidth: Specifies the blocking impedance at the power frequency and the bandwidth over which it offers low loss for the carrier signals.
  • Continuous & Short-Time Current Rating: Must carry the continuous load current of the transmission line and withstand short-circuit currents for a specified duration without damage.
  • Insulation Level: Has specified power frequency and lightning impulse withstand voltages consistent with its system voltage class.
  • Construction: Typically a large, oil-filled or dry-type inductive reactor (for a line trap) mounted on the transmission line, or a coupling capacitor connected between the line and ground.
  • Connection: Installed in series with the transmission line at a substation, often on the line side of the circuit breaker.

Key Advantages and Distinctive Features

The ALSTOM UT150-1 provides essential benefits for transmission line protection communication:

  • High Reliability and Availability: Designed for continuous outdoor operation under extreme weather conditions, providing a dependable communication channel that is intrinsic to the protected line itself, independent of external telecom networks.
  • Secure and Dedicated Channel: Creates a private, physically secure communication link directly over the power line, which is crucial for protection signaling where latency and security are paramount.
  • Excellent Signal-to-Noise Ratio: Effective blocking of the power frequency current minimizes noise and interference, ensuring the integrity of the low-power, high-frequency protection signals.
  • System-Integrated Design: As an Alstom component, it is designed to work optimally with Alstom (now GE) protection relays and teleprotection equipment, ensuring matched impedance and performance.
  • Proven Technology for Long Distances: PLC signaling via devices like the UT150-1 is a proven, robust method for providing protection communication over hundreds of kilometers, often where other means are impractical or too costly. The reliable operation of the ALSTOM UT150-1 is fundamental to the speed and selectivity of line protection schemes.

Application Scenarios and Case Studies

This device is a cornerstone of teleprotection for long-distance transmission lines:

  • Transmission Line Protection: Enabling high-speed directional comparison or distance protection schemes for 220 kV or 400 kV lines spanning remote areas, mountains, or forests.
  • Tie-Line Protection: Providing the communication channel for inter-utility tie lines where coordinated protection between two independent grid operators is required.
  • Network Automation: Used for telecontrol signals to remotely operate line switches or sectionalizing devices.
  • Renewable Integration: Protecting long transmission lines connecting remote wind or solar farms to the main grid.

A typical application case is a 380 kV transmission line crossing a mountain range. At each end of the line, an ALSTOM UT150-1 line trap, along with its associated coupling capacitor and line matching unit, is installed. This setup allows the distance protection relays (e.g., Alstom P443) at both terminals to exchange permissive or blocking signals over the line itself in milliseconds, ensuring that only the faulted line section is tripped, maintaining the stability of the wider grid.

Comparison with Competing Products

Compared to similar line traps and coupling equipment from competitors like Siemens, ABB, or Toshiba, the ALSTOM UT150-1 is a comparable high-quality solution:

  • Platform-Specific Integration: Its primary advantage is seamless integration and recommended use with Alstom/GE protection relay systems, where the entire chain (relay, modem, coupling device) is designed to work together.
  • Performance Parity: In terms of key electrical parameters (impedance, current rating, insulation), it meets or exceeds the same international standards (IEC, IEEE) as its competitors.
  • Legacy System Compatibility: For utilities with an existing fleet of Alstom teleprotection, specifying the UT150-1 ensures consistency and simplifies spare parts management.

Competitors may offer differences in physical design (dry-type vs. oil-filled), tuning mechanisms, or specific frequency range optimizations. The choice is often influenced by utility standards, existing vendor relationships, and the specific requirements of the protection scheme being implemented.

Selection Guidelines and Important Considerations

Selecting and applying this device requires high-voltage system expertise:

  1. Complete System Design: The ALSTOM UT150-1 is not a standalone product. It must be selected as part of a complete PLC coupling system, including the coupling capacitor, line matching unit (LMU), and the protective relay’s teleprotection module. Consult system application guides.
  2. Exact Line Parameters: Critical data includes the system nominal voltage, maximum continuous current, short-circuit current level, and the required carrier frequency band. The device must be rated accordingly.
  3. Environmental Conditions: Consider altitude, ambient temperature range, and seismic conditions, as these affect the mechanical and insulation design.
  4. Tuning and Commissioning: Once installed, the entire coupling circuit must be precisely tuned to the assigned carrier frequency by a specialist. Improper tuning leads to high signal loss and protection scheme failure.
  5. Safety and Installation: Installation is a high-voltage task that must be performed on de-energized lines by qualified high-voltage technicians following strict safety protocols (lock-out/tag-out, grounding).
  6. Testing and Maintenance: Regular maintenance includes visual inspection, checking tuning, and measuring insertion loss. Use the official technical manual for the ALSTOM UT150-1, accessible via the product link, for all installation, tuning, and testing procedures. Always coordinate with the protection relay settings engineer to ensure the communication channel’s performance meets the speed and security requirements of the protection scheme.

HD-32-160 PLC
GE MRP081636 PLC
517-0224-16A-458525 PLC
V511-012V511012 PLC

Brand new✔ In stock ✔ Fast shipping✔
  • Email: sales@plcfcs.com
  • Phone:+86 15343416922
  • Wechat:+86 15343416922
Advantageous products we supply
PLC : Allen Bradley , Siemens MOORE, GE FANUC , Schneider
DCS : ABB ,Honeywell, Invensys Triconex , Foxboro , Ovation,YOKOGAWA, Woodword, HIMA
TSI : Triconex , HIMA , Bently Nevada , ICS Triplex
Complete service we offer
Payment: T/T
Delivery: 1-2 days
Shipment: DHL UPS FedEx, etc
After-sales service: Yes, 24/7 hours